Automatic sliding door cargo room leaching is based on the traditional cargo room leaching, with advanced infrared sensors, automatic door systems, automatic sliding door leaching cargo room compared with conventional leaching cargo room behind closed doors removed, so that the goods shower truly fully automated.
· A detailed description:
· Persons or goods in the automatic sliding door blowing leaching leaching cargo room by auto-sensing infrared sensors, automatic sliding door cargo shower door open and close, dust to be completed after the persons or goods, automatic sliding door leaching cargo room will automatically open and closed out, automatic sliding door cargo room leaching dust the whole process is all automatic sliding door. Automatic sliding door cargo room leaching electronic interlocking of two doors, it can and play the "gas chamber" effect, to prevent outside contamination and not clean air into the clean area. Automatic sliding doors to prevent leaching cargo room staff hair, dust, bacteria into the plant, to the workplace strict clean purification standards.
Pak Shing Features
A door, floor, wall paint can be made of stainless steel or cold plate manufacturing, nice; soft key touch time relay, LED display and set the air shower time;
Second, the use is more suitable for cleanroom principles corner design; automatic control system operation, the door is about to automatically move parallel; the whole cold-rolled steel plate, the outer surface of the electrostatic spray.
Third, using the early, high efficiency filter system with HEPA filter; wind up winds of up to 25m / s or more, blowing wind on the human body 20m / s or more; roller bed can be designed to facilitate the transport of goods.
Note: according to customer demand for non-standard products, lengthened two meters, three meters, four meters long, please pay attention to the opening direction when ordering.
Leaching cargo room Optional accessories:
All stainless steel housing, stainless steel wall, UV germicidal lamp, in addition to static device, automatic door device.
Cargo shower Troubleshooting
one. Power indicator nowhere
Typically leaching cargo room there are three places you can turn off the power:
Leaching cargo box outdoor power switch;
Cargo shower room housing the control panel;
Outside the box on both sides of the cargo shower (here the power switch can prevent an emergency power off, effectively improve the safety of the staff). When the power indicator nowhere, no protection against re-examine the above three cargo room leaching mains.
two. Leaching cargo room fan does not work
When the cargo room leaching does not work the first time to check the cargo tank leaching outdoor emergency switch is off, such as determining the cut off hand touch, rotate the right side to let go.
three. Leaching cargo room leaching cargo room fan invert or small wind speed
The electrician will have someone take a good line when leaching cargo room leaching cargo room fan invert or wind speed is small, be sure to check the 380V three-phase four-wire line is in reverse, general cargo room leaching manufacturer factory installed; such as reverse line source of leaching cargo room, the light will lead to leaching cargo room fan does not work or reversal cargo room leaching reduction of wind speed, weight will burn the entire cargo room leaching circuit boards; recommends the use of cargo room leaching enterprises do not lightly to replace wiring, due to production needs you sure you want to move, please consult cargo room leaching manufacturers resolved.
four. Leaching cargo room is not air shower
In addition to the above three points, the need to check the cargo room leaching tank interior emergency stop button is pressed, such as emergency stop buttons for the color over time, cargo room leaching is not blowing leaching; to re-press the emergency stop button can be normal work.
Fives. Leaching cargo room can not auto-sensing blowing leaching, please check the lower right corner of the box goods shower room light sensing system, see the light sensitive device is installed correctly, such as light perception and light perception on both sides of the positive relative to normal, you can auto-sensing blowing leaching.
six. Leaching cargo room when wind speed is low for some time, please check the cargo room leaching early and efficient filter is too much dust, if so, replace the filter. (Leaching cargo room early effect filters are generally replaced within 1-6 months time, cargo room leaching efficiency filters are generally replaced every 6-12 months).
7. leaching cargo room sale
Pak Shing purification company specialized sales team, one year warranty, 24-hour on-site service. Leaching cargo room 15 years of professional development, production, committed to provide customers with better products, better service.
24-hour service hotline: 400-6811386